Navigating between time windows
The timeline opens on an eight-month window centered on today — two months back and six months ahead. This article covers moving that window forward and back.
Steps
- Open Timeline. The current window is shown in the toolbar (for example, "Jun 2026 – Jan 2027").
- Click the back arrow (◄) to shift the window three months earlier, or the forward arrow (►) to shift it three months later.
- Once you've moved away from today, a Today button appears next to the arrows — click it to jump straight back to the original window.
Each shift reloads the tasks and dependencies that fall inside the new window, so the arrows may briefly show a loading state while the data refreshes.